Building a Backyard Deck

Costs so far:


  • Zach's Page
    Kelsi's page
    Bayla's Page
    Dreamer's page
    Our home
    Photo albums
    Reviews
    Our adventures
            
    Vehicles

    Computer Stuff
    • Tivo
    • Home Network


    Music
    • Tape list
     

  •  
     
     
     
     
     
     
     
     
     
     
     
     
     
     
    1. layout & design                  (March28th)
    2. digging                           (April 9th)
    3. digging                           (April 11th)
    4. permits/design/lumber      (April 14th)
    5. concrete footings               (April 25th)
    6. final footings                         (May 12th)
    7. Install ledger                         (May 13th)
    8. Deck Framing (finally!)    (May 15th)
    9. more framing                        (May 16th)
    10. more framing                     (May 17th-18th)
    11. final framing/flashing      (May 19th)
    12. Decking                       (May 20-31st)
    13. Posts / south stairs          (June 1st)

     

    5/12/04

    The day before yesterday was a big day!! I ordered the lumber....$$$

    I also called Mike W., and Dave Schweers to help out  this Saturday.  Joel Jones also called and said he'll come up and give me a hand on Sat.

    The lumber is arriving Thurs. p.m. so I had to put in some more foundation posts for the stairs that face south. I did that this morning. Tomorrow, Thursday, I'm picking up Mike @ 11:00 and we're going to hang the ledger board and try and get the posts up. If time and lumber permit, I'm going to try and get him to help me put up the beams for the deck, but they'll probably be a bit too heavy to lift ourselves.

    today I also got post to beam hangers, preservative, and bolts/nuts/washersfor the ledger. Kind of pricey though :-(

    it started raining this afternoon....lets hope it isn't doing that tomorrow.

    NEXT PAGE

     
    Fiberglass Post hole digger (flea market) $8.00
    24" wood Stakes $7.49
    String $2.59
    Clear tubing (water level) $3.00
    more String (due to dog chewing)  $2.37
    10" concrete tube  (6) $35.88
    8" concrete tube $4.45
    6x6 metal post bases (6) $53.88
    flashing (3) $12.84
    20'   2x4's  (2) $19.88
    50# bags of gravel (2) $7.94
    scrap lumber $2.55
    25 bags concrete 80# $67.25
    Concrete Mixer Rental $42.13
    P.T. 16' 2x10 (ledger) $32.64
    Subtotal as of : of 4/26/04 $302.89


     

    Zach Andersson