Building a Backyard Deck | Costs so far: | ||
| Zach's Page Kelsi's page Bayla's Page Dreamer's page Our home Photo albums Reviews Our adventures Vehicles Computer Stuff • Tivo • Home Network
|
1.
layout & design
(March28th)
2.
digging
(April 9th)
3.
digging
(April 11th)
4.
permits/design/lumber
(April 14th)
5.
concrete footings
(April 25th)
6.
final footings
(May 12th)
7.
Install ledger
(May 13th)
8.
Deck Framing (finally!)
(May
15th)
9.
more framing
(May 16th)
10.
more framing
(May 17th-18th)
11.
final framing/flashing
(May 19th)
12.
Decking
(May 20-31st)
13.
Posts / south stairs
(June 1st)
4/9/04 I dug some more holes yesterday...2 more to be exact. The first was a piece of cake....nice soft ground. the 2nd had rocks down to 24"...ugh! I took some photos this morning. The boards are covering the holes...don't wan the dogs falling in. I've got more details on the deck: 18'x18' 6x6 posts....8ft apart....total of 6 posts built up beams 3-2x12's 2x10 joists likely I'm going with a Tropical Hardwood decking....I want strength/longevity and low-maintenance...but not plastic crap such as T-Rex and it's competitors. not sure if I want the joists 16" on center or 12". I'd like to eventually be able to hold a Hot Tub....but the deck is going to be pretty beefy anyway. Here's some 3d drawings from the piece of crap Punch Ultimate Deck Software.
That's all for today folks.....
|
Fiberglass Post hole digger (flea market) $8.00 24" wood Stakes $7.49 String $2.59 Clear tubing (water level) $3.00 more String (due to dog chewing) $2.37 10" concrete tube x 6 $35.88 8" concrete tube $4.45 6x6 metal post bases (6) $53.88 flashing (3)
$12.84 |
|