Building a Backyard Deck

Costs so far:

 


  • Zach's Page
    Kelsi's page
    Bayla's Page
    Dreamer's page
    Our home
    Photo albums
    Reviews
    Our adventures
            
    Vehicles

    Computer Stuff
    • Tivo
    • Home Network


    Music
    • Tape list
     

  •  
     
     
     
     
     
     
     
     
     
     
     
     
     
     
    1. layout & design                  (March28th)
    2. digging                           (April 9th)
    3. digging                           (April 11th)
    4. permits/design/lumber      (April 14th)
    5. concrete footings               (April 25th)
    6. final footings                         (May 12th)
    7. Install ledger                         (May 13th)
    8. Deck Framing (finally!)    (May 15th)
    9. more framing                        (May 16th)
    10. more framing                     (May 17th-18th)
    11. final framing/flashing      (May 19th)
    12. Decking                       (May 20-31st)
    13. Posts / south stairs          (June 1st)

     

    3/28/04 I've been mulling over some building ideas recently. I've also done a little site preparation. I have gotten estimates from some local contractors, but the price is way too high for something I can do with help in a few weekends.

    These are some of the things I want my deck to have:

    -2 stairways

    -strength. I want it to be able to hold a hot tub if needed.

    -full length decking. No joints

    -decking parallel to the house.

    I'll take some photos today to show what I've done so far. I've mainly cleared out the site where the deck is going to be...removed goatheads and associated junk from the dirt/grass.

     

    Next Page

     

    Fiberglass Post-hole digger (flea market) $8.00

    24" wood Stakes  (25)                                $7.49

    String                                                    $2.59

    Clear tubing (water level)                          $3.00

    more String (due to dog chewing)            $2.37

    10" concrete tube x 6                             $35.88

    8" concrete tube                                    $4.45

    6x6 metal post bases (6)                       $53.88

    flashing (3)                                           $12.84

    llllllllllllllll

     
    Zach Andersson